January 31 2018

Timeline: Solar Installation San Diego

Start Solar InstallationFrom start to finish, Zero Down Solar solar installations at your home usually are completed within 2-3 weeks. That is 2-3 weeks from the time you decide to the final ‘Permission to Operate’ authorization from SDGE/ local utility. And Zero Down Solar handles all of these and every facet of the installation. The actual construction time on the roof is typically only a couple of days, but design, initial permit approval, and the final inspection of your solar system by the city/county take the extra time. We streamline the process for you by taking care of every aspect of the solar installation and even help with a zero down solar loan- should you want one. Our goal is to ensure that solar installation is completed quickly and efficiently and that you immediately start saving money.

Step 1: Interview & Research Solar Installer

Here is our recommended criteria for choosing a solar installation San Diego company:

  • Licensed
  • Certified
  • High level of maintenance and service offers (find out how long and what is covered in warranties)
  • Years of experience
  • Read testimonials (you can find us on Yelp and Nextdoor)

Some other steps to get started:

  • Analyze past energy bills to determine sizing (we help with this)
  • You may need to advise your utility company of the project
  • Check with your homeowner’s insurance

Step 2: Paperwork and Site Visits (1–2 Weeks)

Site visits by a team of specialists including solar specialists, electricians, roofers, perhaps even engineers.

Job Duties:

Solar contractor will calculate best panel direction and sun intensity in order to determine the best placement of the panels.

Electrician will analyze your existing electrical system and make the necessary changes to allow your house to be safely tied to a solar grid (most older homes will need electrical panel upgrades). This can take a day or more to bring the existing to code.

Roofer or General Contractor will need to make sure the roof structure can support the weight of a rack and solar panels. Plus, you won’t want to have a leaky roof under new solar panels so make sure your roof will last as long as the panels. Reinstalling solar panels after repairing a roof down the road doesn’t make sense.

Step 3: Solar Panel Design Phase (1–2 Weeks)

Digital software can aid the solar panel placement and orientation including recommending locations for the wiring, the connections to components like an inverter and your home’s meter, and the incorporation of additional systems like batteries.

After this point your installer should go over the design with you to assure that you are getting the type and size of panels you want and need. You should have a final say in the design, but remember a redesign can take some time.

Step 4: Submitting for Permits and Approval (1–4 Weeks or Longer)

Once the design is finalized including all the technical documents and data they must be submitted for the necessary permits. San Diego has a strong solar energy market (did you see that the Padres’ Ballpark is going solar?) so our process is streamlined and approval can take just a few days. In other cities the process may take even longer.

An installer who isn’t seasoned can make mistakes during this process and which might result in the permit being rejected.  We have been in the solar business for a very long time and are extremely familiar with the permitting process.

Step 5: PV Installation (1 Week)

With a common roof structure, a solar installation could be completed in a single day. More complex systems can take longer. We can give you an estimate before site work starts.

Step 6: Permit Inspection and Final Sign-Off (1–2 Weeks)

After your solar installation is completed, it must be approved by your utility company and/or a city inspector. This is a checks and balances to make sure your installer did a safe and quality job to local code. At the end of solar installation San Diego, SDGE will also install a new meter that allows for net metering of your electricity.   Once this has been done your new solar system can finally be activated.

Timelines vary from area to area. However, here in California we are often able to complete an installation in just one month- that is from design to final ‘Permission to Operate’ from SDGE/local utility. Once you’ve gone through these steps, you’ll have a reliable and productive solar system that can easily produce electricity for 25 or more years.

Learn more about Solar Installation in San Diego

 

 

Residential Solar Installation Choices: Storage SDGE Time Of Use Rates to Become Compulsory from March 31 2018

Related Posts

CPUC

Solar News, Solar Regulations

CPUC NEM 3 “Proposal” Will Hurt Future Solar Owners

Residential Solar San Diego

Solar News

Approximately 20% of our Zero Down Solar clients use the opportunity of adding solar to reroof their homes! 

Average Solar Panel Cost.docx

Solar News

Average Solar Panel Cost

Search:

Categories

  • Recent Installations
  • Reviews
  • Solar News
  • Solar Regulations
  • Videos

Recent Posts

  • CPUC NEM 3 “Proposal” Will Hurt Future Solar Owners
  • CALSSA Statement on California Energy Commission’s Announcement on California’s Clean Energy Progress
  • Approximately 20% of our Zero Down Solar clients use the opportunity of adding solar to reroof their homes! 
  • Average Solar Panel Cost
  • Debuting ZDS’s New Monitoring & Referral App!

Archives

  • June 2022
  • April 2022
  • February 2022
  • January 2022
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • November 2019
  • August 2019
  • June 2019
  • May 2019
  • April 2019
  • October 2018
  • August 2018
  • July 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017

CSLB License #1022433

Copyright © 2020 Zero Down Solar, all rights reserved.
San Diego, CA 92124

Direct: (760) 776-8182

Installing Solar throughout San Diego County including Poway, Chula Vista, El Cajon, Encinitas and Carlsbad.